this initial attempt runs right after the "packages" jobs and downloads
the resulting artifacts.
The QEMU image is unzipped then the kola test is running using the
ci-automation scripts.
Signed-off-by: Mathieu Tortuyaux <mtortuyaux@microsoft.com>
The new build pipeline compresses images already but uploaded both the
compressed and uncompressed files because the whole build folder gets
uploaded.
Add a new flag "--only_store_compressed" to the image generation which
deletes the uncompressed file after compression is done. Uncompressed
images are still supported if specified in the flag
"image_compression_formats".
Closes https://github.com/flatcar-linux/Flatcar/issues/793
This change will prompt the CI workflow to cancel a currently running
job, if a new push is sent in a PR. This should prevent duplicate jobs
running for the same PR simultaneously.
Signed-off-by: Gabriel Adrian Samfira <gsamfira@cloudbasesolutions.com>
As gdb 11 or newer requires gmp libs as dependency, a cross build of
gdb 11.2 started to fail when its configure scripts try to detect if
gmp exists. The failure occurs mainly because the build still passes
'-L/usr/lib64` to LDFLAGS. Let's say, for example, host toolchains
outside of sysroot have amd64 libs, while the target inside of
sysroot should have arm64 libs. However, configure scripts of gdb 11.2
still try to find its libs outside of sysroot, /usr/lib64, although it
should find its libs inside of sysroot, e.g. /build/arm64/usr/lib64.
To fix the cross build issues, pass --with-sysroot as well as --libdir,
correctly with ${ESYSROOT}.
As a side note, for some reason, upstream gdb configure scripts are not
able to correctly make use of its gmp-specific options like --with-gmp
or --with-gmp-lib. Passing those options does not bring anything.
Also configure must have both --with-sysroot and --libdir, to make the
build work.
To fix build issues that happen in adcli 0.9 with glibc 2.34, we should
sync adcli with upstream Gentoo, where the build issue is already fixed.
As Gentoo has the ebuild under the category `app-crypt`, we simply move
from adcli from coreos-overlay to portage-stable, move adcli to the
app-crypt category, and update the version to 0.9.1-r2.
The original pipeline has package-diff commands to print out image
differences compared to the last release. This is used for the release
Go/No-Go QA checks.
Add the same logic to the new pipeline.
The image job builds an image container that is multiple GBs big and
takes >10 mins to be loaded in the vms job. The vms job can also do its
work by running from the packages container from the packages job when
it fetchs the built image from bincache first and assuming the images
job copies it there.
Skip generating the image container and instead use the packages
container for VM image building by copying the image folder first to
bincache and then retrieving it from there. While reworking this we
also address the issue that the VMs container had used the same name
for both architectures, causing a race when both run in parallel on
the same worker.
When testing "scripts" changes with Jenkins and a leaf job fails, we
currently would have to restart the whole build or update the git tag
manually. Since dealing with the git tag is not straightforward, add
a helper to update it.
Building for the branch push event causes two builds per PR and is not
needed anyway (we have nightly builds for the main branch).
Only consider PR events to trigger the CI build.